Racking & Stacking
Pallet Racking Install: Selective, drive-in, push-back, pallet flow, cantilever
Rack Design & Layout: CAD drawings, capacity calc, aisle sizing, PE stamped
Permitting: City permits, fire marshal, seismic calcs, high-piled storage approval
Shelving Systems: Steel shelving, rivet, boltless, record storage, small parts
Mezzanines: Structural platforms, work areas, in-plant offices, permits included
Rack Relocation: Dismantle, move, reinstall – labeled, inventoried, re-certified
Repairs & Protection: Column repair, post protectors, guardrail, end-of-aisle guards
Inspections: OSHA/RMI compliant audits, load plaques, damage reports
Our Process
Why Choose Us
Frequently asked questions
How long does install take?
100 bays = 2–3 days. 1000 bays = 2–3 weeks. We work nights
Do I need a permit?
Most cities require permit over 8 ft or 12 ft high, or high-piled storage. We handle it
Can you match my existing rack?
Yes. Teardrop, keystone, structural – we ID and match or adapt
What’s my floor capacity?
We core drill or check specs. 6” slab typical = 3000–4000 lb per post
Do you buy used rack?
Yes. We dismantle and credit toward new system